Lyell Collection

Geological Society, London, Engineering Geology Special Publications

Lyell Centre  |   Lyell Collection  |   Subscriptions   |   Geological Society  |   Email alerts  |   Online bookshop  |   Help


Keywords:
Author:
Advanced search>>
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow Request Permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Shirlaw, J.N.
Right arrow Articles by Benjamin, B.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation
Geological Society, London, Engineering Geology Special Publications; 1988; v. 5; p. 93-103;
DOI: 10.1144/GSL.ENG.1988.005.01.07
© 1988 Geological Society of London

Session 2: Ground Movements Due to Tunnelling

A case study of two tunnels driven in the Singapore ‘Boulder Bed’ and in grouted coral sands

J.N. Shirlaw, S. Doran & B. Benjamin

Mass Rapid Transport Corporation, 25k Patterson Road, Singapore #0923

As part of the construction of the Singapore Mass Rapid Transit, two tunnels had to be driven from a shaft to Raffles Place Station. Each drive was approximately 170 m long and was mostly in the Singapore ‘Boulder Bed’. This formation underlies much of the Central Business District of Singapore, and is thought to be a colluvial deposit comprising sandstone boulders in a stiff clay matrix

The first 60 m of the upper tunnel had a mixed face with an old coral reef above axis and the Boulder Bed below it. The corals and sands of the reef were highly permeable and had to be injected with chemical grout before tunnelling commenced.

The Raffles Place area is in the commercial heart of Singapore and the tunnels passed close to two high-rise buildings. One of these buildings had an underground car park within 5 m of the upper tunnel. Shield drives in the Boulder Bed had recorded high surface settlements, and there was concern about the underground car park which was known to be sensitive to settlement. It was proposed to drive the tunnels using the New Austrian Tunnelling Method, and one of the justifications for choosing the technique was that the resulting soil movements could be minimized. In order to check this claim surface settlement arrays, inclinometers and extensometers were installed to monitor movements caused by the tunnelling.

Records of ground movements measured are presented, and compared with the movements recorded above shield driven tunnels in the same deposit. Methods of grouting and testing used in the coral and sands are also reported.